Application / 01Construction
Bring power to welfare cabins, site lighting and tool charging as work moves between compounds.

Fold-out solar arrays and battery storage in one transportable container. Bring power to the sites your work takes you to.

A 76-panel array, a hybrid inverter and battery storage travel together in a single 10 ft container. The array unfolds to a length of 83 m.
Where the grid is out of reach or the job keeps moving, bring generation and storage to the point of use.
Application / 01Bring power to welfare cabins, site lighting and tool charging as work moves between compounds.
Application / 02Take electricity out to seasonal fieldwork, remote sheds and irrigation sites beyond the farmyard.
Application / 03Plan power for lighting, ticketing and production cabins, then pack the system for the next venue.
Each model lists 30 minutes to unfold the array with a crew of 3–4. Allow separate time for lifting, cabling and commissioning.

Move the packed container to the site by lorry.

Use the agreed lifting plan to position the container beside the deployment area.

Open the container and prepare the folded panel frames.

Unfold the linked frames into the clear area alongside the container.

The installation team completes the electrical connections for the site.

The installation team checks the connections and starts the system.

Founded in 1994, Tianyuan designs, manufactures and installs large-span steel structures.
Today we produce solar modules, batteries, inverters and complete PV systems. We bring those capabilities together in transportable solar containers and bespoke systems for individual sites.
Discuss a bespoke systemTell us where you’ll be working, what needs power and how long you’ll be there. We’ll use those details to discuss a system for your site.
Company contact details